Although the Council is involved throughout the discussion of the plans and their timing with the developing parties, the final decision is to continue with a program and reach an agreement, that of the developer, and the Commission has no control over it. When a developer is required to carry out highway work in connection with its development, its development permit requires that it enter into a motorway agreement to carry out the work. If the proposed infrastructure requires routine maintenance, the agreement procedure provides for the guarantee of a re-pending amount for the financing of the work. An application for agreement under Section 278 can only be processed after the building permit has been granted for full or reserved matters. A pre-candidate is possible for the payment of our fees. Conditions for the person to pay all or part of the cost of the work that can be fixed or fixed in accordance with the agreement. As a general rule, these legally binding agreements relate to infrastructure projects that allow access to a construction zone, such as roundabouts, marked intersections, right-hand turn lanes, new pedestrian crossings or priority intersections. They can also cover power diversions, drainage systems and public lighting. The details of the building permit under which the work is carried out – a detailed schedule of the work to be carried out – details of the loan or the necessary security – details of the work; who will design or project the work, generally either the local highway authority or a road engineer advisor on behalf of the developer – A full schedule of the cost of the work paid by the developer, with the management, design and inspection costs to be paid – The details of the administrative, planning and inspection costs to be paid – the details of the operating and inspection costs in many of our work are often reflective point 278 (or S278). The developer is responsible for all costs that we and our service provider incur in preparing and managing the agreement, inspecting the work and monitoring the disposal.

These costs include (but are not limited): in Birmingham, we normally use s278 agreements to allow developers to employ a construction contractor, and for that contractor to work on the existing public highway, as we, the motorway authority, would carry out work. The proponent is responsible for all aspects of the public highway work, from planning to monitoring the construction and ensuring that the work is completed to our satisfaction. As a general rule, the proponent intends that once this work is completed, these new and/or modified highways will be taken over and maintained by the local motorway authority (LHA). As a result, the agreements concluded under Highway 1980 – particularly in this context, Sections 38 and 278 – are generally concluded between the LHA and the proponent to ensure the delivery of necessary or agreed-upon highway work to the necessary standards. We have specific action expertise for owners and developers in sections 278 and 38 and can assist in the drafting, verification and negotiation of these documents.